Sökruta placerad till höger och centrerad
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
post
page

Reparation of CW successful

October 5, 2019

One of the OCWs at Stjärnarp has had problems to reach maximum water levels and we had to bring out an excavator to investigate for leaks

The excavator dug an inspection trench behind the embankment and we managed to find a pipe leaving the wetland through the embankment. This leak has been corrected and now the wetland keeps water fine.

The wetland can now reach maximum water level. Photo taken after some rain with high flows.